BENDIX AD-1 AIR DRYER Guía para resolver problemas

Busca en linea o descarga Guía para resolver problemas para Secadoras de ropa eléctricas BENDIX AD-1 AIR DRYER. BENDIX AD-1 AIR DRYER Troubleshooting guide [en] Manual de usuario

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 16
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 0
1
®
DESCRIPTION
The function of the Integrated Solution Air Dryer (AD-IS
®
)
and Reservoir System is to provide heavy vehicles with an
integrated vehicle air dryer, purge reservoir, governor and a
number of the charging valve components in a module.
These have been designed as an integrated air supply
system.
The AD-IS
®
air dryer and reservoir system collects and
removes air system contaminants in solid, liquid and vapor
form before they enter the brake system. It provides clean,
dry air to the components of the brake system which
increases the life of the system and reduces maintenance
costs. The necessity for daily manual draining of the
reservoirs is eliminated.
FIGURE 1 - AD-IS
®
AIR DRYER AND RESERVOIR SYSTEM
Bendix
®
AD-IS
®
Air Dryer and Reservoir System
DESICCANT
CARTRIDGE
PURGE
RESERVOIR
24
AUX1
AUXILIARY
DELIVERY PORTS
(4)
GOVERNOR
PRESSURE
PROTECTION
VALVES (4)
HEATER /
THERMOSTAT
SAFETY VALVE
AD-IS
®
AIR DRYER
PART NUMBER
STAMPED HERE
MOUNTING
BOLTS (3)
22
SEC
DELIVERY TO
SECONDARY
RESERVOIR
21
PRI
DELIVERY TO
PRIMARY
RESERVOIR
PRESSURE PROTECTION
VALVES (4)
SD-08-2418
MOUNTING
HOLES - 4
Air
Connection Function/Connection QTY
Port ID
1
IN
21
PRI
22
SEC
24
AUX 1
23
AUX 2
UNL Unloader Control Air (D-2A
Governor) 2
RES Common Reservoir Pressure
(D-2A
Governor) 2
EXH Governor Exhaust 1
TABLE 1 - PORT DESIGNATIONS
Inlet Port (air in). 1
Delivery Port out (to Primary reservoir) 1
Delivery Port out (to Secondary reservoir) 1
Auxiliary Delivery Port (air out). 4
Auxiliary Delivery Port (air out). 1
1
IN
SUPPLY FROM
COMPRESSOR
UNL
GOVERNOR
UNLOADER (2)
PURGE VALVE
RES
GOVERNOR
RESERVOIR (2)
EXH
GOVERNOR
EXHAUST
23
AUX2
AUXILIARY
DELIVERY PORTS
(2)
Vista de pagina 0
1 2 3 4 5 6 ... 15 16

Indice de contenidos

Pagina 1 - SD-08-2418

1®DESCRIPTIONThe function of the Integrated Solution Air Dryer (AD-IS®)and Reservoir System is to provide heavy vehicles with anintegrated vehicle ai

Pagina 2

10CLEANING & INSPECTION1. Use a suitable solvent to clean all metal parts, and usea cotton swab to clean the bore (Note: Do not useabrasives or to

Pagina 3 - FIGURE 3 - AD-IS

11AD-IS® AIR DRYER AND RESERVOIR SYSTEM TROUBLESHOOTING CHARTSYMPTOM1. Dryer is constantly“cycling” or purging.A. Test for excessive system leakage.Al

Pagina 4 - PREVENTIVE MAINTENANCE

12TROUBLESHOOTING CHART (Continued)SYMPTOMCAUSEREMEDYD. Replace desiccant cartridge assembly.D. Desiccant requiresreplacement.E. Air by-passes desicca

Pagina 5 - VIDEO BW2327)

13TROUBLESHOOTING CHART (Continued)SYMPTOMCAUSEREMEDYC. Refer to Symptom 1, Remedy B.D. Repair or replace purge valve assembly.E. Check governor at bo

Pagina 6

14TROUBLESHOOTING CHART (Continued)SYMPTOM CAUSEREMEDYB. Excessive bends indischarge line (watercollects and freezes).C. Pressure protectionvalve(s) i

Pagina 7

15A. Compressor fails to“unload”.10. The air dryer purgepiston cycles rapidly inthe compressorunloaded (non-compressing) mode.A. Check air hose from g

Pagina 8

16BW2234 © 2007 Bendix Commercial Vehicle Systems LLC All rights reserved. 5/2007 Printed in U.S.A.

Pagina 9 - FIGURE 7 - AD-IS

2FIGURE 2 - AD-IS® AIR DRYER AND RESERVOIR SYSTEM CHARGE CYCLECOMPRESSORGOVERNORPURGECONTROLCHANNELDESICCANTBEDDELIVERYCHECKVALVE(OPEN)PURGERESERVOIRP

Pagina 10

3FIGURE 3 - AD-IS® AIR DRYER AND RESERVOIR SYSTEM PURGE CYCLECOMPRESSORGOVERNORPURGECONTROLCHANNELDESICCANTBEDDELIVERYCHECKVALVE(CLOSED)PURGERESERVOIR

Pagina 11

4of the contaminants to condense and drop to the bottom ofthe air dryer and reservoir system purge valve assembly,ready to be expelled at the next pur

Pagina 12

5may require replacement; however, the followingconditions can also cause water accumulation andshould be considered before replacing the desiccant:A.

Pagina 13

6A. Electric Power to the DryerWith the ignition or engine kill switch in the RUNposition, check for voltage to the heater andthermostat assembly usin

Pagina 14

7be designed specifically for such applications andsystems.9. Components with stripped threads or damagedparts should be replaced rather than repaired

Pagina 15

8If, after completing the routine operation and leakage tests,it has been determined that one or more components of theair dryer and reservoir system

Pagina 16

9FIGURE 7 - AD-IS® AIR DRYER AND RESERVOIR SYSTEM DELIVERY CHECK VALVEGOVERNOR GASKET(SPECIAL GASKET,SEE NOTE 6)GOVERNOR(NON-ADJUSTABLE,130 PSI CUT-OU

Comentarios a estos manuales

Sin comentarios